Marjon University Sports Centre and Swimming Pool Plant Room Refit
Plymouth
Decommissioned and removed dated boilers and flue system. Supplied and fitted 4 x 150kw Viessmann boilers into a bespoke cascaded system to enable the swimming pool plate heat exchanger and the heat load of the sports centre building to be run alongside each other without issue. Installed a new cascade flue system to service the replacement Viessmann Vito-Cell 1000 litre cylinder, to allow instant hot water demand. Carried out associated works to ensure the whole plantroom, heating and hot water system was set up to be controlled via the new BMS.
Client · Marjon University
