
M+W Group, Surrey (MRF)
Surrey, United Kingdom
Inspection, modifications, and repairs to a problematic conveyor that was not fit for purpose for SRF waste, improving its capacity and performance.
Client · M+W Group
Three System Solutions (Rail) Ltd · Company 16517694 · Trading heritage since 2024
Active·engineer & consultant & main contractor & subcontractor·Head office Mansfield
Three System Solutions has been a prominent company in the engineering sector for over twenty-six years, recently rebranding to reflect a new leadership and strategic direction. The company's mission is to serve clients through safe and innovative design, fabrication, and engineering, aiming to save them time and money. Their vision is to become a world-leading engineering brand within the Energy from Waste industry by 2030.
They operate on five core principles: cost efficiency, expert leadership, stringent health & safety protocols, rigorous quality assurance, and a commitment to reducing environmental impact. They are committed to minimising risks, ensuring high standards of health and safety, and providing robust quality systems. Their environmental policy focuses on monitoring business activities, reducing their carbon footprint, and offsetting emissions through Ecologi.
With a fully equipped workshop, Three System Solutions offers comprehensive fabrication services including MIG, TIG, Gas and Spot Welding, Press Brake Bending and Forming, Guillotine, Laser Cutting, and finishing. Their design team utilises CAD and 3D modelling software for bespoke designs, re-designs to improve performance, and the creation of detailed fabrication and installation drawings. On-site, their skilled engineers handle installations ranging from simple rollers to mini plants and trommels, offering site installations, inspections, modifications, planned preventative maintenance, and electrical installations.
They also provide a 24/7 call-out service to minimise downtime and breakdowns for their clients.

Surrey, United Kingdom
Inspection, modifications, and repairs to a problematic conveyor that was not fit for purpose for SRF waste, improving its capacity and performance.
Client · M+W Group

Southwark, United Kingdom
Design, fabrication, and installation of external guarding around a terminator with an interlocking safety system.
Client · Veolia Southwark (CMRF)

Rainham, United Kingdom
Acted as Principal Contractor for the complex removal of a worn trommel (16 tonne, 50ft high) and its replacement, including electrical decommissioning/commissioning and fabrication of the trommel support frame.
Client · Veolia Rainham (CMRF)

Surrey, United Kingdom
Designed and fabricated a 'self-tensioning primary scraper' for belt conveyors to resolve the issue of dirt accumulation and reduce the need for constant scraper tension readjustment.
Client · Bakers Waste
M+W Group, Acciona UK Ltd, SUEZ Recycling and Recovery UK Ltd, Q&A Structures Ltd, EMR Group, Bakers Waste Services Limited, Veolia UK, Veolia Southwark (CMRF), Veolia Rainham (CMRF).
This profile was compiled from public records. Claim it to add the things buyers ask for:
Three System Solutions provides Design, Fabrication and Installation services, specialising in the 'Energy from Waste' industry for over two decades. Their listed services include Design & build, Steel fabrication, M&E contracting and Rail infrastructure.
Three System Solutions (Rail) Ltd is registered at MANSFIELD, NG19 9ER, in East Midlands.
Three System Solutions (Rail) Ltd states that it works across Nationwide.
Companies House lists Three System Solutions (Rail) Ltd as active.
Three System Solutions (Rail) Ltd works in Industrial and Energy.
Three System Solutions (Rail) Ltd was incorporated on 2025-06-13, though the company says it has traded since 2024.
Planyard replaces manual CVR spreadsheets with a live system connecting budget, orders, invoices and committed costs, so you can see where every project stands before month-end surprises hit.