Construction
Network UK

Teignmouth Maritime Services Ltd

Active, accounts up to date·main contractor & subcontractor·Head office Dawlish

About from company website

TMS Ltd brings 35 years of expertise as a marine contractor within the civil engineering sector, operating across the UK and Europe. The company specialises in a wide range of marine and civil engineering construction projects, including seawalls, quayside piling, dredging, and turnkey design-to-build solutions for tidal, coastal, and inland waterways. They pride themselves on a "can do" culture, immersing themselves in projects and offering clients input from the concept and design stages to ensure the most effective solutions.

With a focus on customer and client satisfaction, TMS strategically delivers works using directly employed personnel and a substantial marine plant portfolio, enabling rapid and efficient responses to client needs. Safety and quality are paramount, supported by a multiskilled qualified workforce. From directors to the on-site team, there is a shared focus on value and efficiency to provide clients with the best economical solutions.

Services

Works as

Sectors

Project experience from company website

Shoring up Appledore's Middle Dock Quay Wall

Appledore, North Devon

Design and construct structural enhancement works to the quay wall at Appledore, North Devon. The project forms a key part of preparations for the new Appledore Clean Maritime Innovation Centre (ACMIC), a landmark development for sustainable marine technology. By reforming and strengthening the existing quay, the works have created a safe and resilient waterfront, capable of supporting a wide range of marine operations and vessels.

Client · Torridge District Council

Sharpness Pier Repairs, Sharpness Dock

Sharpness Dock, River Severn

Sharpness South Pier is located downstream of the outer gates (sea gates) to Sharpness Tidal Basin. The pier is effectively located within the River Severn, at the point where the river meets the Gloucester & Sharpness Canal. The function of both north pier and south pier is to guide ships into the Tidal Basin from the River Severn. In June 2020 the MV Lady Adele on arrival at Sharpness Port contacted the South Pier at Sharpness. As a result of the vessel impact, the South Pier sustained damage which required urgent inspection as-well-as removal of seabed debris and loose elements that may become detached in the near future.

Client · Canal River Trust, Kier

Stonehaven Pier Reconstruction

Stonehaven Harbour

Construct three new pier heads around three historic ones in Stonehaven Harbour. The three new pier heads were to encapsulate the existing Net Pier, South Pier and Fish Jetty structures which had all been considered to have reached the end of their serviceable life and were at risk of failure if their condition were allowed to degrade further.

Client · Aberdeenshire Council

The Big Painting

Cardinal Place, Victoria, London

A creative solution to the practical problem of wind blowing through the buildings at Cardinal Place. The sculpture was designed by Patrick Heron and brought to life on a grand scale. It consists of numerous brightly coloured floating shapes connected with linear patterns. Neon tubes light up the sculpture at night with a pathway of lights directing people through the sculpture on foot. The Big Painting was commissioned in 1998.

Client · Landsec

Clients mentioned from company website

Landsec, Torridge District Council, Canal River Trust, Kier, Aberdeenshire Council.

Similar companies

All civil engineering contractors in Dawlish →

Is this your company?

This profile was compiled from public records. Claim it to add the things buyers ask for:

  • Services and specialisms in your own words
  • Accreditations and insurance, with cover levels
  • Areas you cover and how far you travel
  • Typical project size and contract types
  • Recent projects with photographs
  • Capability statements and brochures to download
  • Plant and in-house trades you own
  • Who to contact for enquiries and tenders
Claim this profile

Questions about Teignmouth Maritime Services Ltd from the record on this page

What does Teignmouth Maritime Services Ltd do?

TMS Maritime is a leading UK marine construction and civil engineering firm-delivering seawalls, quayside piling, dredging and turnkey design-to-build solutions across tidal, coastal and inland waterways. Their listed services include Civil engineering, Marine & water engineering, Piling, Groundworks and Plant hire.

Where is Teignmouth Maritime Services Ltd based?

Teignmouth Maritime Services Ltd is registered at Unit 20 And 22b Dawlish Business Park, Dawlish, EX7 0NH, in South West.

What areas does Teignmouth Maritime Services Ltd cover?

Teignmouth Maritime Services Ltd states that it works across Europe.

How many people work at Teignmouth Maritime Services Ltd?

Accounts filed for the year to 2023 report 84 employees, which places the company in the 50-249 employees band.

What is Teignmouth Maritime Services Ltd's turnover?

Teignmouth Maritime Services Ltd does not disclose turnover: UK small-company accounts are not required to. Based on trade debtors in its filed accounts, turnover is likely to fall between £6.9m and £18.0m. This is an estimate, not a filed figure.

Is Teignmouth Maritime Services Ltd still trading?

Companies House lists Teignmouth Maritime Services Ltd as active, with accounts most recently made up to 2025-03-31.

What sectors does Teignmouth Maritime Services Ltd work in?

Teignmouth Maritime Services Ltd works in Infrastructure, Commercial and Public.

When was Teignmouth Maritime Services Ltd established?

Teignmouth Maritime Services Ltd was incorporated on 2002-11-22, though the company says it has traded since 1988.

See where your project budget stands now, not after month-end

Planyard keeps budgets, committed costs and variations live, so the figure in front of you is today's rather than last month's.