
London Eye Bolts Project
Central London
Installation of "eyebolts" onto an iconic building with listed status. Work was carried out over several weekends, with each eyebolt resin fixed into brickwork.
Step Above Safety Ltd · Company 11649071
Active, accounts up to date·subcontractor·Head office Dover
Step Above Safety Ltd are specialists in working at height safety systems, with over 20 years of experience in the design, installation, testing, and inspection of these critical safety measures. The company prides itself on delivering innovative, unique, and cost-effective safety products, all meticulously tailored to suit individual client needs by a highly experienced design team. All products supplied are quality assured, with immediate manufacturer support available if required, and the Design & Estimating Department is equipped to provide full designs for all installation products and services.
The company offers a comprehensive range of services including Design & Installation of Fall Restraint Systems, Horizontal and Vertical Fall Arrest Systems, Single Anchorage points, Safety Barriers & Guard Rails, Demarcation Systems, Rope Access Anchorage Solutions, and Ladder & Access Systems. Complementing these are Inspection & Certification services for the same systems, as well as Lightening Protection Inspection and Testing. Furthermore, Step Above Safety provides a wide array of Product Supply options, including Horizontal and Vertical Lifelines, Single Anchorage points, Guard Rails, Rope Access Anchors & Davits, Demarcation Systems, Fall Protection & Rescue Equipment, and PPE.
Beyond installation and supply, Step Above Safety offers crucial Support Services such as Work at Height Risk Assessment, Site Survey, Method Statement Development and Implementation, and specialized Training, including Rescue from Height Training and Gutter Cleaning. Their commitment to safety is further demonstrated through their product lines like Guard Angel (passive safety), Roof Angel (horizontal lifeline systems), Weight Angel (mobile man anchors), Sky Angel (skylight protection), Walk Angel (walkway systems), and Demarc Angel (demarcation systems). They are also approved installers for Axcess100 Height Safety Systems and Kratos Vertical Lifelines, ensuring a broad spectrum of solutions for diverse working at height challenges.

Central London
Installation of "eyebolts" onto an iconic building with listed status. Work was carried out over several weekends, with each eyebolt resin fixed into brickwork.

Kent
Installation of a lifeline system for a well-known retailer on their new store.
Luke Crocker, Lucy Shanahan, Chris Tuft, Christine De vries, Daniel King, Martin F.
This profile was compiled from public records. Claim it to add the things buyers ask for:
Step Above Safety Ltd are specialists in the design, installation, testing and inspection of height safety systems. With over 20 years of experience, we offer innovative and cost-effective safety products tailored to your needs. Their listed services include Scaffolding, Roofing, Cladding, Waterproofing and Damp proofing.
Step Above Safety Ltd is registered at Unit 7 White Cliffs Business Centre Honeywood Road, Whitfield, Dover, CT16 3EH, in South East.
Step Above Safety Ltd states that it works across Nationwide.
Accounts filed for the year to 2025 report 4 employees, which places the company in the 1-9 employees band.
Step Above Safety Ltd does not disclose turnover: UK small-company accounts are not required to. Based on creditors in its filed accounts, turnover is likely to fall between £100k and £400k. This is an estimate, not a filed figure.
Companies House lists Step Above Safety Ltd as active, with accounts most recently made up to 2025-02-28.
Step Above Safety Ltd displays SATRA, Constructionline, Bettersafe International, Kingspan, CSCS and HSE on its website.
Step Above Safety Ltd works in Commercial, Industrial, Infrastructure, Public and Residential.
Step Above Safety Ltd was incorporated on 2018-10-30.
Track budgets, committed costs, invoices and profitability in one place, so cost issues show up before they turn into margin surprises.