Rab Construction Ltd

Active·main contractor & subcontractor·Head office Wakefield

About from company website

RAB Construction Ltd is a family-owned and managed groundwork and civil engineering business with over 35 years of experience in the construction industry, primarily focused on roads & sewers, deep drainage, excavations, foundations, and hard landscaping. We operate throughout the north of England, including Leeds and wider West Yorkshire, South Yorkshire, and The North. We have successfully completed numerous contracts across the residential, healthcare, educational, industrial, and commercial sectors.

Utilizing our own specialist plant fleet and expertly qualified workforce, we offer a full and complete groundworks/civil engineering service. We are happy to assist any client, from developers to contractors, with operations such as site clearance & remediation, bulk earthworks, mass fill foundations, ring beams, structural steelwork, floor slabs, suspended floors, substructure masonry, vapour & damp barriers, insulations & screeds, external works, specialist structures, and hard landscaping. Our services also extend to domestic drainage, foul & rainwater sewers, deep & shallow inspection chambers, manholes & separator tanks, attenuation tanking, roads & footpaths, and multi-utility trenching & ducting.

Whether your project is a single residential property or a large regeneration village, a classroom extension or university campus, a doctor's surgery or a care home, a convenience store or a hypermarket, an office park or an advanced manufacturing facility, we treat every contract with the same care and attention to detail. You and your clients will benefit from our unrivalled experience & knowledge and receive the highest standards of workmanship the industry has to offer.

Services

Works as

Sectors

Project experience from company website

Social Housing Site, Middleton, South Leeds

Social Housing Site, Middleton, South Leeds

Middleton, South Leeds

Challenging brownfield regeneration site with weak bearing strata and high water table. Overcame conditions to provide piled foundation ringbeams, large diameter deep drainage and large diameter traditionally built manholes as part of Section 104 adoptable drainage system, full construction Section 38 adoptable highway / footpaths, shared and private driveways and lastly the residential hard & soft landscaping.

Client · Esh Build

Social Housing Site, Beech Hill, Halifax

Halifax

106 new build housing for local residents on a former brownfield site. Ground conditions caused a challenging development with the use of pile and ring beam foundations, raft foundations and strip foundations. All associated infrastructure, roads, sewers, plot services, foundations, and external works supplied and completed by RAB construction.

Client · Esh Construction LTD

New 60 Bed Care Home

New 60 Bed Care Home

Boston Spa

Intricate substructure and drainage package involving more than 500m3 foundations at multiple stepped locations. All associated sub slab drainage, high spec landscaped sensory gardens for residents, permeable car park and attenuation tank etc whilst maintaining live existing footpath through the site and respecting existing residential cul-de-sac at site entrance location.

Client · Galliford Try Partnerships

CT Scanner Unit Extension

Scunthorpe General Hospital

Delicate scheme involving the construction of an extension to the Hospital in order to relocate the CT Scanner. All Wards & Corridors remained opened to patients and staff during the construction phase and noise, dust & vibrations were kept to a minimum throughout by carrying out hand excavations and utilising only micro plant. A precision laid floor slab allowed for the seamless relocation of the the actual CT Scanner resulting in minimal clinical capacity loss for the Hospital.

Client · F Parkinson

2 No. Extensions, Pedestrian Footbridge, New MUGA & New Car Park

Totley Primary School

Hugely complex scheme taking place in 5 different locations within the school. All within the confines of an already tight site and maintaining a safe environment for staff and pupils along with protected drop off & pickup times. The larger 3 storey extension was set into a hillside with a waterproof RC basement and associated underpinning works to the existing aged assembly hall. All new drainage was carefully integrated into existing systems whilst maintaining live flows. The pedestrian bridge was skillfully placed on screw piles.

Client · Engie Regeneration

7 No Industrial Units

Thorpe Arch Industrial Estate

Classic large scale industrial project involving large pour floor slabs and high volume surface water runoff attenuation forming part of mass warehousing / logistics space, along with all associated foul drainage, car parking, data / comms / utility provision, yard aprons and external works.

Client · Hobson Porter

200 No. Apartments

Kelham Island, Sheffield

Flagship build as part of the highly prestigious redevelopment of the Historic City's burgeoning cultural quarter. As well as the typical groundwork & drainage this scheme was notable for its luxury hard landscaping, a fusion of natural pennine sandstone and imported Vietnamese flamed granite, laid to precision finishes using a proprietary mortar bedding system. Also pioneered the world's first combined attenuating slot drain as part of RAB's design input / value engineering proposals as the site constraints didn't allow the required attenuation capacity.

Client · Keepmoat

New Build 60 Bedroom Hotel & Retail Complex

Mansfield Town Centre

Innovative & technically challenging scheme involving the demolition of a bingo hall whilst retaining a historical adjoining facade. Combined retaining walls acting as load bearing foundations, lift shafts and ground bearing floor slabs all undertaken as phased sequential operation. Ultra modern car park with smart security & access systems. EV charging points, alarmed fuel interceptors, usual drainage/manholes/attenuation, new multi flight RC pedestrian staircase with retaining parapets and lastly a full refurbishment of the existing on site substation.

Client · Harris Construction Management

Accreditations from company website

  • SMAS Worksafe
  • CHAS
  • CSCS
  • Construction Line

Clients mentioned from company website

Esh Build, Esh Construction LTD, Galliford Try Partnerships, F Parkinson, Engie Regeneration, Hobson Porter, Keepmoat, Harris Construction Management.

Similar companies

All groundworks contractors in Wakefield →

Is this your company?

This profile was compiled from public records. Claim it to add the things buyers ask for:

  • Services and specialisms in your own words
  • Accreditations and insurance, with cover levels
  • Areas you cover and how far you travel
  • Typical project size and contract types
  • Recent projects with photographs
  • Capability statements and brochures to download
  • Plant and in-house trades you own
  • Who to contact for enquiries and tenders
Claim this profile

Questions about Rab Construction Ltd from the record on this page

What does Rab Construction Ltd do?

RAB Construction Ltd is a family-owned groundwork and civil engineering business with over 35 years of experience. We operate across the North of England. Their listed services include Groundworks, Civil engineering, Drainage, Site clearance and Road surfacing.

Where is Rab Construction Ltd based?

Rab Construction Ltd is registered at WAKEFIELD, WF3 3SL, in Yorkshire.

What areas does Rab Construction Ltd cover?

Rab Construction Ltd states that it works across North Of England, Leeds and Yorkshire.

Is Rab Construction Ltd still trading?

Companies House lists Rab Construction Ltd as active.

What accreditations does Rab Construction Ltd hold?

Rab Construction Ltd displays SMAS Worksafe, CHAS, CSCS and Construction Line on its website.

What sectors does Rab Construction Ltd work in?

Rab Construction Ltd works in Residential, Commercial, Industrial, Healthcare, Education, Retail and Infrastructure.

When was Rab Construction Ltd established?

Rab Construction Ltd was incorporated on 2009-04-23.