
Manchester Leisure Centre
The system is split over 2 roofs: one over the swimming pool with metal roof sheeting and another over a gym with a flat felt roof and timber sub structure. Edge protection was installed to all roof areas, with scaffold towers for main access. Mains power connection was made outside of normal working hours.


