
22 Bishopsgate
City of London
Full Water Distribution to FCU (Level 27). The project involved the complete installation of chilled water supply and return piping for all Fan Coil Units (FCUs) on Level 27. This covers the routing, connection, and balancing of the water distribution network from the main risers to each FCU, including valves, fittings, insulation, and associated supports, in accordance with approved drawings and specifications.



