
Bull Bay Hotel
This project involved the demolition of the former Bull Bay Hotel and construction of a new apartment as well as three new individual dwellings within the site. The roles of this consisted of drainage strategy, phase 1 and 1 of geo-environmental investigations, transport assessment, hydraulic modelling of the proposed drainages networks and 3D modelling of the proposed site levels, and drainage systems. We also produced the design drawings for the project, obtaining SAB and section 104 approvals, liaising with the SAB, DCWW the design team and client. This project is currently on site being constructed.


