
Hildon Water Ltd
Commercial Hot Water Installation. Upgrading the hot water system from an existing Vaillant combination boiler which was supplying multiple outlets throughout the Hildon water bottling factory. Install a Vaillant unvented calorifier, zone the heating and hot water, install an hot water secondary return throughout the factory to ensure instant hot water at the required setpoint temperatures, Grundfos secondary return pump with full time control. Now supplying infared taps in the factory for hygiene purposes.
Client · Hildon Water Ltd




