Southend Pier
Carried out an EICR (Electrical Installation Condition Report) report for the entirety of the pier and then undertook all remedial works that were required. The works took place over a number of weeks to a stringent timetable in co-ordination with the management and security of the pier to ensure normal operation could continue during peak season. A number of issues were found that were missed by previous reports and were promptly rectified.