Construction
Network UK

Hammerjack Ltd

Active, accounts up to date·main contractor & subcontractor·Head office Bury

About from company website

Hammerjack are a leading professional demolition and asbestos contractor based in the West Midlands. We challenge the negative stereotypes associated with demolition work by providing a safe, clean working environment for our staff, the general public, and the environment. Our philosophy is achieved through careful planning and consultation with clients and all affected parties, ensuring effective, safe, and satisfactory final delivery on site.

We offer a complete enabling package, encompassing meticulous pre-construction planning, site setup, ground clearance, specialist asbestos removal, full-scale demolition, and post-demolition crushing and screening services. Our highly experienced and dedicated team tackles complex projects, operating to the highest industry standards with an unwavering commitment to safety and training. Our services include site clearance, remediation, soft strip demolition, asbestos removal, demolition, and enabling works.

We have a strong track record in handling challenging projects, from large warehouse units and former nightclubs to iconic listed buildings and business parks, always prioritizing safety and quality.

Services

Works as

Sectors

Project experience from company website

Former office nightclub Wigan

A four-storey former retail store with AIB ceiling tiles on every floor including an extensive basement from the 1970s and in poor condition. Hammerjack controlled a tight programme switching between floors to allow for environmental cleaning, guano removal, licenced and non-licenced asbestos removal and full internal strip out was carried out cohesively and on time and budget. Lack of space for any skips presented additional challenges.

Queen Street, Wolverhampton

A four-storey former retail store with AIB ceiling tiles on every floor including an extensive basement from the 1970s and in poor condition. Hammerjack controlled a tight programme switching between floors to allow for environmental cleaning, guano removal, licenced and non-licenced asbestos removal and full internal strip out was carried out cohesively and on time and budget. Lack of space for any skips presented additional challenges.

Bretby Business Park, Burton-on-Trent

Burton-on-Trent

Hammerjack was appointed as Principle Contractor to split off and demolish a heavily reinforced concrete framed building. The planning was complex due to the steel trusses at high level which had been tightened together and under tension. The factory adjoined to it was live 24 hours a day and the building had to be split without interruption to their processes. Dust suppression was a key consideration on this project as all concrete had to be crushed and deposited within 5m of the remaining buildings in the middle of a hot, dry summer.

GE Healthcare, Amersham, Bucks

Amersham, Bucks

Hammerjack were contracted in to remove asbestos shuttering to the underside of a 1960s heavily reinforced concrete building after previous attempts to remove by hand became exhausted. Works were carried out in a full enclosure under licenced conditions to prepare it for demolition by the previously awarded, demolition contractor. Controlling the dust and debris and asbestos fibres was the major challenge.

Client · GE Healthcare

Bull Ring, Soft Strip

Birmingham

Hammerjack were contracted in to remove asbestos shuttering to the underside of a 1960s heavily reinforced concrete building after previous attempts to remove by hand became exhausted. Works were carried out in a full enclosure under licenced conditions to prepare it for demolition by the previously awarded, demolition contractor. Controlling the dust and debris and asbestos fibres was the major challenge.

Harborne Royalty Cinema, Birmingham

Birmingham

Hammerjack were contracted in to make safe the iconic Harborne Cinema in Birmingham after a devastating fire. The Cinema was built in the 1930 in the heyday of British film and was Protected as a grade 1 listed building. The fire had ravaged the building making it unsafe to enter however that was not the primary concern. The cinema had been renovated in the 1960s and Asbestos Insulation Board had been installed under the seating of the auditorium. The fire had broken down the material and spread it across the building and now the whole cinema was not only structurally unsound but contaminated.

Former Night Club, Birmingham City Centre

Birmingham City Centre

Hammerjack were contracted to demolish the Former nightclub which was directly on to the public pathway and had a shared wall with the neighbouring office building as well as a shared carpark with a nationwide Car hire Company and a shared rear service road with the neighbouring food restaurant which could not be blocked as was also the only fire escape for customers. We took on the project as Principal Contractor and had to liaise with all the effected parties affected and obtain the Party Wall agreements. We also had to apply for permits to build the scaffolding and hoarding on the pavement and make arrangements to divert pedestrian traffic without forcing people on to the busy A38 coming out of the city centre.

Large Warehouse Unit, Crawley

Crawley

Hammerjack were instructed to take back to shell a large industrial unit which had been abandoned by the previous owners so that it could be re-leased to new occupants. Asbestos had to identified and removed. All the walk-in fridges had to be dismantled safely and disposed of as they had ozone depleting insulation within their panelling. Un characterised and labelled, dangerous chemicals and gasses had to be risk assessed and disposed. Buried oil and diesel tanks cleaned and excavated. All the M&E including gas mains and air conditioning had to be isolated, re-routed, blanked, degassed, and removed by hand at height on scissor lifts. The offices had to be stripped back, demolished in parts, and reconfigured to the original design. The floor had to be cleaned and prepared for the new occupants. The work was carried out with a team of 32 men, seven days a week and completed in six weeks (one week ahead of target).

Strip Out-Herford Hospital

Hereford

Hammerjack were contracted to strip out the ICU wing at Hereford Hospital by a Blue-Chip Client. The works were reactive and had to be carried out with two days' notice and all the accumulated debris had to be segregated into recyclable groups and taken to individual facilities to ensure we attained the clients a 95% recycle targets. The work was carried out with a large team within two weeks on target.

Client · Blue-Chip Client

Strip Out Former Magnet Store, Wrexham

Wrexham

Hammerjack were contracted to strip back the unit of a former Magnet Store to allow for its new occupancy after a previous contractor failed to begin the works. The works ere reactive and the project was priced, awarded and we were onsite within three days of first contact.

Strip Out-Former Offices and nightclub- Liverpool

Liverpool

Hammerjack were called in to remove a huge amount of asbestos from multiple floors and strip back all the offices and nightclub back to shell to allow for re-occupancy and a new usage. The works involved removal of structural elements to re-configure the building and floor levels. The works involved removal of huge insitu built safes and document storage rooms as well as the removal of heavily fortified dancefloors and stages which themselves were above occupied store and offices below at ground level. All the work had to be carried out by hand with minimal notice and the waste carried out of the building via a single staircase. The lift could not be used due to dual occupancy.

Accreditations from company website

  • ROSPA
  • CHAS
  • Constructionline
  • NDTG

Clients mentioned from company website

GE Healthcare, Blue-Chip Client.

Is this your company?

This profile was compiled from public records. Claim it to add the things buyers ask for:

  • Services and specialisms in your own words
  • Accreditations and insurance, with cover levels
  • Areas you cover and how far you travel
  • Typical project size and contract types
  • Recent projects with photographs
  • Capability statements and brochures to download
  • Plant and in-house trades you own
  • Who to contact for enquiries and tenders
Claim this profile

Questions about Hammerjack Ltd from the record on this page

What does Hammerjack Ltd do?

Hammerjack are leading professional demolition & asbestos removal contractors based in the West Midlands, working to the highest of industry standards. Their listed services include Demolition, Asbestos removal, Site clearance, Restoration & heritage and Refurbishment.

Where is Hammerjack Ltd based?

Hammerjack Ltd is registered at 2 Heap Bridge, Bury, BL9 7HR, in North West.

What areas does Hammerjack Ltd cover?

Hammerjack Ltd states that it works across West Midlands.

How many people work at Hammerjack Ltd?

Accounts filed for the year to 2025 report 2 employees, which places the company in the 1-9 employees band.

What is Hammerjack Ltd's turnover?

Hammerjack Ltd does not disclose turnover: UK small-company accounts are not required to. Based on headcount and trade debtors in its filed accounts, turnover is likely to fall between £140k and £380k. This is an estimate, not a filed figure.

Is Hammerjack Ltd still trading?

Companies House lists Hammerjack Ltd as active, with accounts most recently made up to 2025-07-31.

What accreditations does Hammerjack Ltd hold?

Hammerjack Ltd displays ROSPA, CHAS, Constructionline and NDTG on its website.

What sectors does Hammerjack Ltd work in?

Hammerjack Ltd works in Industrial, Commercial and Public.

When was Hammerjack Ltd established?

Hammerjack Ltd was incorporated on 2016-12-20.

See where your project budget stands now, not after month-end

Planyard keeps budgets, committed costs and variations live, so the figure in front of you is today's rather than last month's.