
CFLDN
E1, London
Completion of New Flagship CrossFit facility. CFLDN now have one of the premier CrossFit gyms in the country.
Client · CFLDN
Habitation Ltd · Company 05715732
Active, accounts up to date·architect & consultant & main contractor
Habitation Ltd is an architectural design and project management company operating in the high-end construction and renovation sector. They offer a complete solution for design and construction requirements, leveraging established relationships with industry professionals. Their in-house team of architects and designers focus on maximising space and light, with each project managed by a dedicated Project Manager to ensure fidelity to the design.
Through a network of skilled craftspeople and specialist subcontractors, Habitation Ltd delivers ambitious client briefs. Recent works encompass period renovations, restorations, warehouse conversions, and radical modernisation projects, both within the UK and internationally. They pride themselves on realising a building's full potential, from initial concept through to final completion.

E1, London
Completion of New Flagship CrossFit facility. CFLDN now have one of the premier CrossFit gyms in the country.
Client · CFLDN

E2
Railway Archs - Converted to a Gym. A series of railway arches, reconfigured for the use by Europe's first CrossFit affiliate. Creating 6 training spaces, a reception + male and female changing areas.

Renovation of a Large Townhouse. The Substantial renovation of a large home, including basement and extensions.

SE4
Traditional Renovation with Compempory Extenson. The reconfiguration of a large private home including a modern rear extension.

Warehouse Renovation. Creation of a contemporary warehouse space for residential use and for use as a location for filming and photography.

E8
Warehouse Extension and Division. A tight urban site, surrounded by residential and commercial developments and transport infrastructure. The existing two storey building has been extended in multiple directions to create a total of eight units - a mix of residential and commerical. The scheme included exterior spaces for all residential units.

Uganda
Primary School, Uganda. St Kizito, Namungoona a live project involving a new primary school in the suburbs of Kampala, Uganda. The scheme consists of seven primary classrooms, an early years centre, a modified ventilated improved pit (VIP) toilet system, a kitchen and canteen, a variety of communal outdoor spaces and a large assembly hall. The new school, construction of which is due to start in 2012, will be funded by New York based NGO Bula Inc. In 2011 the project was nominated from a RIBA medal.
Client · Bula Inc.

France
Winery Conversion. The third and final conversion of a series of winery buildings in southern France. Originally the building had no scope for exterior space - the solution involved the removal of a large section of the buildings roof to create a rear, walled courtyard. A swimming poor was created at first / mezzanine level, keeping access to the pool central to all levels within the building. This unusual designed allowed for the inclusion of a window between the living space and the water within the swimming area.

France
Winery Conversion. The Winery East apartment provided an excessive living area 200m in size. To ensure that the space was practical and usable, it was necessary to divide the area into a number of habitable zones - offices, cinemas, kitchen, pantry, storage, etc. The large living area faces onto a swimming pool, lines with the original stone pillars that flanked the grape weighing area of the winery. The upper floor was divided up into five bathrooms, accessed via a central hall (lit from above). The design was modified to incorporate the doors and radiators that had been reclaimed from local demolition projects.

France
Stable Conversion. This stable building formed part of a former winery dating back to 1802. The property provided a unique setting for a modern home that incorporated all of the building`s original features including 60cm thick stone walls, timber shutters and a tiered garden. 100m2 living area and five bedrooms were created over the to floors of the house, along with a number of feature bathrooms and an infinity pool that overlooked the remainder of the garden.
CFLDN.
This profile was compiled from public records. Claim it to add the things buyers ask for:
Habitation Ltd is an architectural design and project management company specialising in high-end construction and renovation projects, from concept to completion. Their listed services include Design & build, Refurbishment, Restoration & heritage, Extensions and Fit-out & interiors.
Habitation Ltd states that it works across Abroad.
Accounts filed for the year to 2025 report 1 employees, which places the company in the 1-9 employees band.
Habitation Ltd does not disclose turnover: UK small-company accounts are not required to. Based on headcount in its filed accounts, turnover is likely to fall between £72k and £190k. This is an estimate, not a filed figure.
Companies House lists Habitation Ltd as active, with accounts most recently made up to 2025-02-28.
Habitation Ltd works in Residential, Commercial and Leisure.
Habitation Ltd was incorporated on 2006-02-20.
Planyard replaces manual CVR spreadsheets with a live system connecting budget, orders, invoices and committed costs, so you can see where every project stands before month-end surprises hit.