.jpeg)
University Hospital Wales Cardiff
Cardiff
The original exhaust was causing the hospital problems with getting fumes coming through the windows above. On each system we installed a 200mm Dinak GE50+ system which took the exhaust up to above the roof level. This meant the hospital would not be without power in case of an outage and they no longer had to keep the windows shut to stop fumes.
Client · NHS hospital
