Spotify Camp Nou Stadium, Barcelona
Barcelona
DLT supplied 277 Lock-Up Devices (LUDs) along with connection pins and plates for the renovation and expansion of the Camp Nou Stadium.

Dlt Engineering Ltd · Company 03940897
Active, accounts up to date·supplier & engineer & consultant·Head office Higham Ferrers
DLT Engineering specialises in developing, manufacturing, and operating specialist technology for the modular construction of a wide range of structures, including bridges, dams, refineries, power stations, offshore structures, buildings, and manufacturing plants. They offer comprehensive construction engineering and site services, aiming to maximise client value from their equipment. Their approach involves developing solutions to construction challenges, engineering them fully, and then collaborating with clients on site operations.
DLT provides a flexible combination of erection engineering, equipment supply/rental, and site supervision services tailored to project needs. Their product range encompasses bridge construction equipment, offshore construction equipment, jacking tower systems, strand jacks, hydraulic gantries, skidding systems, and synchronised jacking and weighing systems. All projects are managed under ISO 9001:2015, OHSAS 18001:2007, and ISO 14001:2015 accredited company management systems, developed in-house for relevance to their business.
DLT also offers construction engineering consultancy services for various structures, with particular expertise in long-span bridge erection and specialist modular construction operations like heavy lifting, lowering, and horizontal skidding.
Barcelona
DLT supplied 277 Lock-Up Devices (LUDs) along with connection pins and plates for the renovation and expansion of the Camp Nou Stadium.
Indian Ocean
Mammoet Offshore performed a Float Over operation using a DLT designed and supplied 24 x 1,250t jacking system for the installation of a topside.
Client · Mammoet Offshore
Denmark
DLT supplied Jacks successfully completed the first skidding operation, skidding up to 9,000 tonne over 65 meters. 2,950 support jacks with a combined lifting capacity of around 890,000 tonnes were supplied by DLT.
Guangdong, China
DLT supplied 2x500t deck erection gantries for the deck erection of the Lingdingyang Bridge.
Client · Guangdong Provincial Changda Highway Engineering Co
Turkey
DLT Engineering supplied 8 No 450 tonne capacity bridge deck lifting gantries, as well as PPWS cable erection winches and rollers, cable compactors and cable wrapping machines for the longest span suspension bridge in the world.
China
DLT's MYQ5000 strand jack tower system was used by China National Petroleum to erect a 4606 tonne x 116m high column.
Client · China National Petroleum
Brunei
2 x 870 tonne innovative bridge deck erection gantry designed, manufactured and supplied by DLT Engineering installed the last deck segment.
China
Sinopec No. 10 successfully erected a 2450 tonnes vessel (130m height and 9.2m diameter) using the DL-TS3600 tower system designed and supplied by Dorman Long Technology.
Client · Sinopec No. 10
China
175 No deck segments were lifted into position in just 10 No weeks. DLT were responsible for the concept and detailed design of the 500t SWL deck erection gantries and saddle erection gantry.
London, UK
Final jump operation completed using 4 x DL-CP250 Pinned Climbing Jack System raising the factory to final position and completing the construction of twin residential towers.
UK
The first deck unit on the Queensferry Crossing cable stay bridge has been lifted into place using DLT designed deck erection gantries.
Dallas
American Bridge lift a 95 m long 200 tonne arch centre section using DLT strand jacks and computer control system.
Client · American Bridge
Mammoet Offshore, China National Petroleum, Sinopec, FAST Consortium, PTSC, Vanguard, Nippon Steel, Swiber Offshore Construction Services, ONGC, Network Rail, Highways Agency.
This profile was compiled from public records. Claim it to add the things buyers ask for:
DLT Engineering develops, manufactures and operates specialist technology for modular construction of bridges, dams, refineries, power stations, offshore structures, buildings and manufacturing plants. Their listed services include Modular & offsite construction, Civil engineering, Design & build and Crane hire.
Dlt Engineering Ltd is registered at International House, Midland Road, Higham Ferrers, NN10 8DN, in East Midlands.
Dlt Engineering Ltd states that it works across Nationwide.
Accounts filed for the year to 2022 report 19 employees.
Dlt Engineering Ltd does not disclose turnover: UK small-company accounts are not required to. Based on trade debtors in its filed accounts, turnover is likely to fall between £5.0m and £13.0m. This is an estimate, not a filed figure.
Companies House lists Dlt Engineering Ltd as active, with accounts most recently made up to 2024-12-31.
Dlt Engineering Ltd displays ISO 9001, OHSAS 18001:2007 and ISO 14001 on its website.
Dlt Engineering Ltd works in Infrastructure, Energy and Industrial.
Dlt Engineering Ltd was incorporated on 2000-03-06.