Walk Wheel Cycle Trust: NCN Route 6 Cycle Path
Installation of modular drainage units to create an integrated sustainable drainage system on a 200-metre stretch of Route 6, widened to three metres and resurfaced. The project utilized a no-dig build method due to complex and constrained conditions, including proximity to the West Coast Main Line and local badger habitats. The surrounding verge was seeded with meadow grass to enhance biodiversity. The sustainable drainage plan received approval for the whole ~2.5km route, enabling a further ~1km extension.
Client · Walk Wheel Cycle Trust
