Denmark Tower
Denmark
A tower 5.5m in diameter and 26m tall, completed in 11 days.
Client · Inter Silo
Byggwik (U.K.) Ltd · Company 01356618 · Trading heritage since 1976
Active, accounts up to date·supplier & main contractor·Head office Ludlow
Founded in 1976, Byggwik began with a focus on constructing high-quality storage tanks rooted in Scandinavian engineering standards. The economic downturn of the 1980s led Byggwik to innovate, adapting tank jacking techniques for repair and life-extension, creating the Byggwik base repair system. As markets recovered, Byggwik's expertise grew, culminating in 2008 with the construction of three of the largest storage tanks ever built using the jacking method.
The company provides services globally, with a base in Ludlow, UK, and has a proven track record in diverse environments, from Denmark and Romania to Nigeria, Taiwan, Brazil, and the USA. Byggwik's capabilities include the construction of various types of tanks, such as grain bins, tower dryers, floating roof tanks, gasholders, and light hydrocarbon storage tanks. They also undertake tank refurbishments and have developed unique techniques like the "Bygghook" for specific site requirements.
Denmark
A tower 5.5m in diameter and 26m tall, completed in 11 days.
Client · Inter Silo
Denmark
Two 60ft diameter grain bins, involving 12 lifts over 4 days.
Client · Inter Silo

The biggest structure built with the Byggwik system.

Romania
The second tower dryer built in Romania this year.
Client · Rosilo

Nigeria
Latest project in Nigeria.
Client · Hopic

Taiwan
Building a floating roof tank with jacks.
Client · Nay Yih Engineering

United Kingdom
A double shelled tank, lifted for a completely new base and floor, an apparently new attempt in the UK.

Taiwan
Construction of a new Wiggins type gasholder with a capacity of 100,000 cubic metres of gas (58m diameter, 60m height).
Client · Dragon Steel

Aracruz, Brazil
Jacking 3 new large Light Hydrocarbon storage tanks with unique self-supporting roofs.

Brazil
Carried out the first tank refurbishment.

Northern Brazil
Working on agitator tanks.

North East Brazil
Jacking tanks at the new Petrobrás refinery, RNEST, developing new techniques.
Client · Petrobrás
Inter Silo, Rosilo, Hopic, Nay Yih Engineering, Tata Group, Dragon Steel, Petrobrás, Vapor Ilhas, Grant Livingston.
This profile was compiled from public records. Claim it to add the things buyers ask for:
Byggwik (U.K.) Ltd: 35+ years of transforming groundbreaking ideas into reality. Specialising in tank construction and jacking systems globally. Their listed services include Civil engineering, Steel fabrication, Steel erection and M&E contracting.
BYGGWIK (U.K.) LTD is registered at Coder Road, Ludlow Business Park, Ludlow, SY8 1XE, in West Midlands.
BYGGWIK (U.K.) LTD states that it works across Denmark, Romania, Nigeria, Taiwan, Canada and Brazil.
Accounts filed for the year to 2025 report 4 employees, which places the company in the 1-9 employees band.
BYGGWIK (U.K.) LTD does not disclose turnover: UK small-company accounts are not required to. Based on headcount and trade debtors in its filed accounts, turnover is likely to fall between £670k and £1.8m. This is an estimate, not a filed figure.
Companies House lists BYGGWIK (U.K.) LTD as active, with accounts most recently made up to 2025-12-31.
BYGGWIK (U.K.) LTD works in Industrial and Energy.
BYGGWIK (U.K.) LTD was incorporated on 1978-03-09, though the company says it has traded since 1976.