Construction
Network UK

Bd Nuclear Ltd

Active, accounts up to date·subcontractor & supplier·Head office Portsmouth

About from company website

BD Nuclear specialises in nuclear decommissioning, offering a diverse range of services with a pragmatic and innovative approach. With extensive experience since 2005, the company has become a market leader in size reduction cutting solutions, particularly diamond wire cutting technology within the UK nuclear industry. They have accumulated over 1 million operational man-hours in nuclear environments with an excellent safety record.

Their expertise spans metal cutting, including turbines, vessels, and pipework, as well as concrete cutting in challenging locations. BD Nuclear also provides surface removal services using advanced systems. They pride themselves on adapting and providing innovative solutions, often developing bespoke equipment to meet project-specific demands.

Health and safety are paramount, with continuous review of procedures, investment in training, and a strong safety culture. The company utilises advanced remote and semi-remote equipment, including the innovative 'Stealth' wire saw, for nuclear works. They also undertake plunge cutting, track sawing, and core drilling on concrete structures.

BD Nuclear is committed to bringing the latest technologically advanced equipment into the field through close collaboration with specialist suppliers, ensuring maximum output and efficiency for their clients.

Services

Works as

Sectors

Project experience from company website

High Level Duct Removal

Replacement of a large section of ducting which was carried out at a significant height from a scaffold platform.

SDP Plant Removal

Sellafield

Removal of stainless steel pipework and vessels from the SDP Pant.

FEDER Demolitions

Trawsfynydd

Demolition of concrete structures above the Fuel Element Debris (FED) Cells.

Dragon Bio Shield Removal

Segmentation and removal of a bio shield using a combination of Wire and Track Sawing. Bespoke lifting bars were used for handling.

Plinth Size Reduction

Reduction in height of two concrete plinths (14 metres long, 2.2 metres wide by 800mm) with a 12mm tolerance over the length.

Congress Theatre Eastbourne

Eastbourne

Careful removal of existing masonry walls and structural slab in the basement of a grade II* listed building, without damaging existing fixtures and fittings.

Basement Window

Creation of 2 window holes in a basement to allow more light in, completed within a time-critical timeframe.

Stealth III

Introduction of a new bespoke design and innovation with the 'STEALTH III' Hot cell wire saw.

Valero Duct Removal

Replacement of a large section of ducting which was carried out at a significant height from a scaffold platform.

Similar companies

All demolition contractors in Portsmouth →

Is this your company?

This profile was compiled from public records. Claim it to add the things buyers ask for:

  • Services and specialisms in your own words
  • Accreditations and insurance, with cover levels
  • Areas you cover and how far you travel
  • Typical project size and contract types
  • Recent projects with photographs
  • Capability statements and brochures to download
  • Plant and in-house trades you own
  • Who to contact for enquiries and tenders
Claim this profile

Questions about Bd Nuclear Ltd from the record on this page

What does Bd Nuclear Ltd do?

Specialist nuclear decommissioning services including metal and concrete cutting, surface removal, and remote demolition robots. Their listed services include Demolition, Concrete works, Steel fabrication and Site clearance.

Where is Bd Nuclear Ltd based?

Bd Nuclear Ltd is registered at 1 Oyster Estate, Jackson Close, Portsmouth, PO6 1QN, in South East.

What areas does Bd Nuclear Ltd cover?

Bd Nuclear Ltd states that it works across Nationwide.

Is Bd Nuclear Ltd still trading?

Companies House lists Bd Nuclear Ltd as active.

What sectors does Bd Nuclear Ltd work in?

Bd Nuclear Ltd works in Industrial, Energy, Infrastructure and Public.

When was Bd Nuclear Ltd established?

Bd Nuclear Ltd was incorporated on 2006-09-21.

Live project visibility for contractors

Track budgets, committed costs, invoices and profitability in one place, so cost issues show up before they turn into margin surprises.