
The Aztec Hotel & Spa
The project involved a rapid turnaround for the main reception area. The existing subfloor had failed due to moisture from the pool area. The rectification included resealing perimeter glass seals, applying a liquid damp proof membrane, and using two coats of Latex smoothing compound before fitting Amtico Form LVT with an epoxy adhesive.



