Mixed variety of homes
Construction of 14 homes, 2 garages, and 3 retaining walls with incorporated steps. The homes were semi-detached and detached brick and block structures with stonework details. The garages and boundary stone walls with copings were all constructed by Andrew and David of A&D Probuild. The project duration was 15 months, from July 2020 until the end of October 2021. All brickwork, blockwork, stonework, and copings were constructed during this period. The brickwork design and foundation work were undertaken before the formation of A&D Probuild Ltd. Properties received outstanding reviews from the building inspector.